EN FA
• Using PLC for on-off control and sequential control
• PLC output status monitoring using  indicator lamps and buzzer
• Possibility to analog control by PLC
• Applying different input modes to PLC through different types of switches
• Industrial monitoring by PLC and HMI
• Proximity sensors with on-off output
• Traffic light simulator
• 3-floor elevator simulator
• Easy access to PID inputs and outputs
1) S7-300 PLC with digital and analog inputs and outputs
2) Six binary (0/1) command switches
3) 24V, 3A power supply
4) 8 indicator lamps  to monitor PLC output
5) One buzzer as a PLC output
6) Start-stop and emergency stop switches
7) Optical and capacitive proximity sensors
8) 8 auxiliary relays with NO and NC contacts
9) Graphical interface, capable to connect to the PLC
10) Traffic light simulator with four 3-state and four 2-state 24V lamps
11) 3-floor elevator simulator with 6 switches, 3 micro-switches and a 24V motor

 
Hello, do you have a question at our service?